Berkshire Hall: Renovation
Note: unless otherwise indicated, all prints are dated 05/08/1963 and are by The Architect's Collaborative
Blueprints:
- Folder 1
- Folder 2
-Heating and Ventilating System: Basement Plan
-Heating and Ventilating System: First Floor Plan
-Heating and Ventilating System: Second Floor Plan
-Heating and Ventilating System: Third Floor Plan
-Plumbing System: Basement Plan
-Plumbing System: First Floor Plan
-Plumbing System: Second Floor Plan
-Plumbing System: Third Floor Plan
-Plumbing System: Various Riser Diagrams
-Plumbing System: Sanitary Sewer Revision: Basement Plan (06/07/1963 Shooshanian Engineering)
-Basement Plan showing Fixture Schedule (05/08/1963, revised 05/27/1963)
-First Floor Plan showing Fixture Schedule (5/8/63, revised 05/27/1963)
-Second Floor Plan showing Fixture Schedule (05/08/1963, revised 05/27/1963)
-Third Floor Plan showing Fixture Schedule (05/08/1963, revised 05/27/1963)
[edit]
Williams College Blueprint Collection,
1905 - present
Introduction
Index to Buildings
[A-E] [F-M] [N-Z]
Miscellaneous Objects (Oversize)
Scanned Blueprints
[edit]