Berkshire Hall: Renovation


Note: unless otherwise indicated, all prints are dated 05/08/1963 and are by The Architect's Collaborative

Blueprints:

  • Folder 1

  • -Various Interior Elevations of Proposed Renovation
    -Various Interior Elevations of Proposed Renovation
    -Second Floor Plan
    -Third Floor Plan
    -First Floor Plan
    -Basement Plan
    -Detail, Specifications for Door on 'Cellar Door' Recess (08/20/1963)
    -Detail, Specifications for Exterior Stair, North End (n.d.)
    -Detail, Layout of 2x4 Nailers to be Attached to Underside of Existing Ceiling Slab (06/27/1963; The Architects Collaborative?)
    -Detail, Specifications for Hardware (08/01/1963)
    -Detail, Specifications for Toilets (n.d.)
    -Detail, Specifications for Order of Toilet Compartments (01/24/1961, revised 07/12/1963)
  • Folder 2

Williams College Blueprint Collection,
1905 - present

Introduction
Index to Buildings
[A-E] [F-M] [N-Z]
Miscellaneous Objects (Oversize)
Scanned Blueprints